Steel pipe fabrication
Regardless of the technique used to create the pip
Stranded costs
A stranded cost refers to the amount invested in a
Sub-meter
Sub-meters are meters installed behind a master me
Substation
A set of equipment on an electrical system that tr
Supply-side competition
Supply-side competition refers to competition betw
Surge impedance loading (SIL)
Surge impedance loading is a quantity used by syst
Switching
Switching is the process of rerouting the path tha
Switchyard
A switchyard is the set of facilities outside a po
Synchronization
In an AC electric power system, synchronization is
Synthetic natural gas (Syngas)
Synthetic natural gas (SNG), also sometimes called
System restoration
System restoration, sometimes simply called restor
Tariff
Tariffs are public documents, written by regulated
Tennessee Valley Authority (TVA)
TVA is owned by the United States government. TVA
Test year
A test year is the 12-month period used in a rate
Therm
A therm is a natural gas unit equal to 100,000 Btu
Three-part communication
Three-part communication is a process used in the
Three-phase power
Three-phase power refers to an electrical system t
Three-phase service
Three-phase service is typically provided to large
Tidal hydropower plants
Tidal hydropower plants, also called tidal barrage
Time-of-use rate
Time-of-use rates change the price of electricity